Vtb stadium. Cska arena (vtb ice palace)

From the first day of its foundation, the central stadium "Dynamo" has been the sports Mecca of our state. Reviving the greatness of the stadium, returning it to its former glory and thousands of regular spectators are the primary tasks of the project.

The central stadium "Dynamo", which is part of the general ensemble "VTB Arena Park", will unite two objects under one roof: a small and a large sports arenas, as well as a leisure and entertainment complex designed for an interesting pastime before or after sports events. The new complex will become a place where entertainment is the main criterion for what is happening.

In 2010, the management of the VTB Arena Park project invited the leading specialized bureau Manica Architecture, represented by its founder and renowned architect David Manika, to elaborate the concept of the project in order to improve the functionality of the building, as well as ensure the manufacturability of its construction, in order to ultimately obtain a unique our country is a sports and entertainment complex. Among the projects implemented by Manica Architecture are such interesting structures as the stadium in the capital of Qatar, Doha, the Mercedes-Benz Arena in Shanghai, the Olympic basketball hall in Beijing and the stunning O2 Arena in London.

This is how Manika himself assesses the work done: VTB Arena Park is one of the most interesting and exciting projects I have ever worked on. If you look at structures already created around the world and constructed buildings, you will not find a single object exactly like this one. Bringing together a large sports stadium and a multifunctional arena that "hover" above the shopping and entertainment center and the preserved historic stadium wall, this project is undoubtedly a new benchmark for similar development projects around the world. VTB Arena Park will be a place that city residents and visitors to the capital will be able to enjoy throughout the year and for many decades. " During construction, the main contractor changed, but, despite this, the work did not stop for a single day.

The project uses revolutionary ideas, new materials and technologies. On the southern facade, overlooking Leningradsky Prospekt and the Dynamo metro station, there will be a huge glass wall with LED strips built into it, allowing the glass to turn into a giant screen at night.

The total capacity of the Dynamo Central Stadium will be 25,716 seats, and the small sports arena, being built under the same roof as the football one, has 3 configurations: hockey, basketball and concert. The capacity of the multifunctional arena is from 12 273 human, but can transform depending on the event in a matter of hours. The maximum occupancy is 14 000 seats. In terms of technical equipment, it will be the most modern concert venue in Moscow. The working group of the project studied all the known technical "riders" of modern world shows, which today are difficult to implement in the conditions of Moscow stadiums and, taking into account the international experience studied, formulated the appropriate technical requirements for the reconstruction of the stadium.

Leisure and entertainment complex area - 30 thousand m2

There is also a parking lot for 733 cars under the sports and entertainment complex.

The official opening of the Dynamo Central Stadium, which was named after Lev Ivanovich Yashin, the best goalkeeper in the world of the twentieth century according to FIFA, took place on May 26, 2019 in the Dynamo - Arsenal match (3: 3).

Reconstruction of the Dynamo stadium is one of the largest projects in the north of Moscow. Back in 1928, when the stadium was built, this area was, in fact, the outskirts. And now it is considered quite a center.

VTB Arena Park is a complex development project of the territory, which includes the construction of a multipurpose sports and entertainment complex (VTB Arena and the Dynamo Central Stadium), the Dynamo Sports Academy, the Arena Park city quarter, and a sports park "Dynamo". The area of ​​the project being implemented is about 32 hectares.

On the day of shooting, the weather was completely bad for the drone, and the scale of the construction of such an object is difficult to assess from the ground. So after a couple of days, when the sun came out, I returned to the stadium and filmed it from the air.

As I said, the stadium was built in 1928 and since then has been completed several times and reconstructed twice. The stadium underwent a major reconstruction on the eve of the 1980 Olympics, the last one before closing - on the eve of the World Youth Games in 1998. Today Dynamo is going through the largest reconstruction in its history, the scale and tasks this time are much more serious and impressive.

And if in the past renovations they cared little about the preservation of the historical heritage (in the process of researching the former structures of the stands, remakes and traces of rebuilding of structures were constantly found), now the task is to preserve the historical western wall of the stadium, which has been granted the status of an architectural monument since 1987. Also, special attention will be paid to the restoration of the bas-reliefs of the outstanding Soviet sculptor Sergei Merkurov, which for more than 80 years adorned the northern and southern porticos of the stands.

The rest of the facades will be restored based on the results of measurements and a comprehensive study.

Now let's go to the object and see what happens there.

1. The last match at the stadium was played in November 2008, when the dismantling of concrete structures began. VTB entered the project only in 2010. At first, there was a very long period of approvals, transfer of communications, dismantling of the stadium and its foundation.

2. The project is the owner of a large number of various prestigious awards in different nominations.

3. Initially, it was assumed that the new Dynamo stadium will be included in the application book for hosting matches of the 2018 World Cup, but this did not happen, and its capacity was reduced from the planned 45 to the final 27 thousand spectators. The project was incorporated into the contours of the old stadium, the geographic orientation of the field remained the same. The exclusion of the stadium from the application book, according to the representatives of the project, made it possible to "squeeze" the shape of the arena, to make it more compact and comfortable. However, there is some disappointment that the oldest operating stadium will not accept World Cup matches.

4. The most important change is that previously there was only a football stadium in the perimeter of the walls. And now a multifunctional arena, a commercial level (shops, etc.), the Dynamo Museum, underground parking and much more will be added to it. Thus, the complex will meet all the latest requirements.

5. The football field itself is now raised 8 meters above the ground. Previously, it was "sunk" by about half a meter.

6. Work is now being carried out around the clock.

7. Active construction work on the sports part of the project began in July 2014.

8. Retained West Stand and former commentary booths.

9. The load-bearing structures will be reinforced, and the stand will become part of the complex. The western facade will become the main entrance to the arena.

10. The total capacity of the football stadium will be 26,319 seats, and the capacity of the universal arena - from 11,500 to 14,000, depending on the configuration - hockey, basketball or concert.

11. A giant screen will be placed on the western façade facing Leningradsky Prospekt.

12. The roof itself will be made of special materials (polycarbonate) that allow light to pass through. In addition, LED strips will be built into it, which in the dark will allow the dome to be used as a media facade of a huge area.

13. Future ramps for entering the field, to service premises, and so on.

14. The lawn, of course, will be natural.

15. On this plate there will be a special layer cake with a height of one and a half meters with a lawn life support system. The pipes that stick out of the concrete are just part of it.

16. The opening of the renovated Dynamo stadium will be marked by the first football match, which is scheduled for Lev Yashin's birthday, October 22, 2017.

17. Nearby will be the Dynamo Sports Academy. Sports and training complex with a total area of ​​62,800 sq. m includes two hockey grounds, a gymnasium, halls for martial arts, for playing squash, for team sports, fencing, as well as a medical rehabilitation center.

18. After the reconstruction, the stadium will bear the name VTB Arena - Dynamo Central Stadium.

19. Place of planning meetings at the construction site.

20. And some renderings of how it will look. The Arena itself, the park and the city block. Among the park, you can see the Sports Academy with a green roof.

21. That same huge media screen.

22. To implement the project in 2011, the international architectural bureau Manica Architecture, headed by the American architect David Manica, was involved.

23. Universal arena - hockey rink.

24. Basketball version of the VTB Arena configuration.

25. And a concert venue. Since the late 1980s, the stadium has been used for concerts. On July 23, 1996, the first Deep Purple concert in Russia took place here. The concert of Michael Jackson, given as part of the world tour "HIStory" and held on September 17 of the same year, became the largest event in the history of the stadium: 71 thousand spectators were accommodated in the bowl of the stadium.

26. In the foreground is the foundation pit of the Petrovsky Park station. The Moscow Stroycomplex plans to complete the construction of this station in 2016. The station is included in the first section of the TPK and will be a transfer with the Dynamo station. So the transport accessibility of the new sports facility in the capital will be high.

27. To the right of the station pit - transition to the Dynamo station.

28. As you can see, the inclined course has already begun to pass.

29. General view of the construction site.

30. VTB Arena - Dynamo Central Stadium.

31. Thanks to the press service of the VTB Arena Park project for their help in organizing the shooting!

Exactly a year ago, on October 22, 2017, a new field was inaugurated at the Dynamo stadium, which has been reconstructed since 2008. The stadium has not yet been commissioned. There is no mass psychosis in this regard,.

The last time FC Dynamo became the champion was 42 years ago, in 2016 Dynamo dropped out of the Premier League for a year, it is included in.

In October 2016, senior vice president of VTB Bank, head of the VTB Arena Park project (which includes the Dynamo stadium) Andrey Peregudov said that the entire VTB Arena Park project costs $ 1.5 billion (95 billion rubles in October 2016). “I think this amount is fair. VTB Bank has approved the financial model and updates it regularly. The project should certainly pay off, ”added the interlocutor of TASS.

Previously, the stadium was supposed to be completed by the summer, and the first match in the new arena was to take place between the national teams of Russia and Turkey on June 5.

“However, a number of difficulties arose and the terms were slightly shifted,” the deputy mayor emphasized.

“According to the plans of the investor, all work at the Dynamo stadium will be completed by the end of the year. Another world-class sports facility will open in the capital, ”said M. Khusnullin.

As a reminder, in February of this year, the installation of copies of historical bas-reliefs by sculptor Sergei Merkurov on the facades of the reconstructed Dynamo stadium was completed.

Under the roof of the renovated Dynamo stadium there will be an open-air football arena and a small multifunctional arena for holding competitions in hockey, basketball and other sports. The total capacity of the football stadium will be 26 thousand spectators. Under the stadium there is a parking lot for more than 700 cars, a shopping center, as well as premises for the Dynamo Museum and technical services.

« Moscow has become the football capital of the world... Because, firstly, during the reconstruction, we were able to fully preserve the appearance of the Luzhniki stadium and at the same time make it modern, ”Khusnullin TASS quotes.

Football capital of the world

“83.5 billion rubles will be spent on the reconstruction of the entire Luzhniki Olympic complex” - Chief Architect of Moscow Sergei Kuznetsov.

The 45-thousandth stadium "Spartak" ("Otkrytie Arena"), which does not have a sliding roof and a roll-out field, was built for 7 years. In 2017, the state spent 450 billion rubles on the rescue of FC Otkritie.

The state-owned company "Vnesheconombank" has been building the 30-thousandth stadium "VEB Arena" for 9 years. It is 2.3 times smaller than the St. Petersburg stadium in terms of capacity, it costs more than 23 billion rubles, there is no sliding roof or roll-out field, the average occupancy is 50%.

The stadium for the unpopular club Lokomotiv (Russian Railways Arena) was built by the state company Russian Railways. With an average occupancy rate of 47%, it brings only losses, which are paid by Russian Railways.


Of the five Moscow stadiums, only Otkritie Arena is regularly filled with more than half - 65%, CSKA stadium - 50%, Lokomotiv stadium - 47%, Dynamo - 38%. On average, Luzhniki hosts less than 5 matches per year. In total, only 0.4% of the total population of Moscow comes to watch the games of all four Moscow teams. The average attendance at stadiums in Russia is 2.5% of the total population of the city.

StadiumUnder constructionWe will accommodate.
thous.
people
Sec.
roof
Dedicated
field
Price
RUB bln *
Price
thousand rubles / person
CSKA2007-2016 30 23 767
135
Locomotive2000-2002 27 ≈20 ≈740
≈805
Spartacus2007-2014 45 25 556
465
VTB Arena2008-2019 36 40 1111
191
LuzhnikiConstruction
Reconstruction
1996–1997
2001–2004
2007–2008
2013–2017
Sum
81 >30 ≈1135
≈416
Amount (5) 209 0 0 ≈201 ≈962
?
Fisht2007-2013, reconstruction in 201448 46 958
St. Petersburg2007-2016 68 + + 603
140
Krasnodar2013-2016 34 20 588
139
2009-2012 50 + 23 460
?
2006-2009 50 140 2800
?
Mercedes-Benz Stadium2014-2017 43 + 90 2140
?
Perth stadium2014-2017 65 120 1850
?
MetLife Stadium2007-2010 83 110 1330
?
AT&T Stadium2005-2009 80 + 96 1200
?
Olympic Stadium (Montreal)1973-1977 61 + 90 1080
?
London stadium2008-2012
Reconstruction
2013-2016
Sum
66 50 1060
?
Wembley stadium2003-2007 90 + 71 790
?
U.S. Bank stadium2013-2016 67 72 1070
?
Bakı Olimpiya Stadionu2011-2015 70 53 750
?
National Stadium (Singapore)2010-2014 55 + 115 2090
?
Levi's Stadium2012-2014 75 92 1230
?
Estádio Nacional Mané GarrinchaReconstruction
2010-2013
70 70 1000
?
2010-2012 17 72 4230
?
Citi field2006-2009 45 65 1440
?
Lucas Oil Stadium2005-2008 70 + 56 800
?
Nationals Park2006-2008 41 53 1290
?
Emirates stadium2004-2006 60 46 770 3. VTB Arena - 209,794.0 sq. m - 1.4 times less than the stadium "St. Petersburg"
4. "VEB Arena" - 170,200.0 sq. m - 1.7 times less than the stadium "St. Petersburg"
5. Samara Arena - 156,233.0 sq. m - 1.8 times less than the stadium "St. Petersburg"
6. Fisht Stadium - 148,200.0 sq. m - 1.9 times less than the stadium "St. Petersburg"
7. Krasnodar Stadium - 143,385.1 sq. m - 2.0 times less than the stadium "St. Petersburg"
8. Rostov Arena - 128,255.0 sq. m - 2.3 times less than the stadium "St. Petersburg"
9. Nizhny Novgorod Stadium - 127,500 sq. m - 2.3 times less than the stadium "St. Petersburg"
10. Volgograd Arena - 123,970.8 sq. m - 2.3 times less than the stadium "St. Petersburg"
11. Mordovia Arena - 122,137.7 sq. m - 2.4 times less than the stadium "St. Petersburg"
12. Kazan Arena - 121,544.4 sq. m - 2.4 times less than the stadium "St. Petersburg"
13. Kaliningrad Stadium - 112,511.7 sq. m - 2.6 times less than the stadium "St. Petersburg"
14. Yekaterinburg Arena - 57 110.0 sq. m - 5.1 times less than the stadium "St. Petersburg"
15. Spartak Stadium (Otkrytie Arena) - 53,758.0 sq. m - 5.4 times less than the stadium "St. Petersburg"
16. Russian Railways Arena - 24,832.1 sq. m - 11.6 times less than the stadium "St. Petersburg"
17. "Arena Khimki" - 22,343.2 sq. m - 12.9 times less than the stadium "St. Petersburg"

news

LATEST NEWS ABOUT THE CONSTRUCTION OF THE DYNAMO STADIUM

25.12.2017 - The head of VTB Arena in 2017 and talked about how the format of cooperation with FC Dynamo is being discussed.

22.10.2017 - The presentation of the bowl of the new Dynamo stadium took place. We led.

18.10.2017 - Four days before the presentation of the stadium bowl, the field is already marked. In general, the bowl looks almost finished from this angle.

12.10.2017 - At the stadium "Dynamo" they are laying a lawn, the installation of seats continues.

27.09.2017 - Builders. Let us remind you that in 2016, the developer conducted a vote among the fans, and the winner of the poll was, as a reminder, this version of the appearance of the stands.

09.09.2017 - Yuri Nikulin, Igor Chislenko and Dynamo veterans - these were the names that received the largest number of votes from participants in the competition to name new streets near the Dynamo stadium. Earlier, 12 variants of names for three streets were selected, which will appear during the implementation of the VTB Arena Park project. At the same time, if the city street naming commission for certain regulatory requirements does not legally fix these voting results, the next rated options will be named the winners. Thus, the final results of the competition will be announced after the final meeting of the commission.

12.07.2017 - First Deputy President - Chairman of the Board of VTB Bank, Member of the Board of Directors of Dynamo Vasily Titov commented on the words of the general director of the blue and white Evgeny Muravyov: “I have not seen this statement and I do not know what it is connected with. Of course, the club itself decides where to play. We have always assumed that VTB Arena is the home stadium of Dynamo, we never had any other understanding. I believe that what happened is a misunderstanding. "

11.07.2017 - At a meeting with the fans, the general director of Dynamo Evgeny Muravyov spoke about the problems in negotiations with VTB Arena: “Stadium? The situation is not easy. We are having difficult negotiations with a company that works there. She speaks loud words, where we play different matches, talks a lot about herself and forgets who she is building the stadium for and why. If this continues, I will have to apologize to you if we play at a different stadium and not at Dynamo. We have Luzhniki as a last resort. "

14.06.2017 - Presidium of the Central Council of the Dynamo Society. Earlier, according to the site, negotiations were held between the management of the society and representatives of Eflen. Fully repaying the entire revised debt in accordance with the agreements reached with VTB's mediation is expected to be a 17.3% stake in CJSC Dynamo Management Company, which owns the Petrovsky Park project together with the stadium under construction. At the same time, the only real asset in the project that remains in the ownership of the VFSO, the office building intended for the CA itself, will continue to be registered with the company, Eflen will receive only a share in the authorized capital. Thus, VFSO will have a 7.7% stake, while VTB holds a controlling stake of 75%. If the memorandum is executed, “Dynamo” will be able to pay off all the debts that, upon presentation, threatened the club with bankruptcy. Among the minuses is a decrease in the share in Petrovsky Park, but the profitability of the project, even in the long term, raises big questions, because the management company has yet to repay loans for the implementation of the project. As for the stadium, from 25% to 7.7%, FC and CS had to negotiate the terms of use of the arena under construction. It is assumed that the lease will be free of charge on the basis of division between FC and UK match proceeds.

13.12.2016 - The perimeter of the load-bearing metal structures of the roof of the Dynamo stadium has closed at VTB Arena Park today.

07.06.2016 - Project Manager "VTB Arena Park" Andrey Peregudov stated that the cost of building a new stadium for Moscow Dynamo did not increase during the construction of the arena and remain within the original estimate.

18.03.2016 - Moscow Mayor Sergei Sobyanin visited the reconstruction of the Dynamo stadium on March 18 and inspected the progress of the work.

09.03.2016 - The VTB Arena Park project was awarded the winner's prize in the City of the Future category.

25.02.2016 - Dynamo fans carried out a crash test of the seats at the team's stadium under construction, which they managed to break in 5 seconds. Now they promise to be finalized.

24.02.2016 - For the first time, the project of coloring the stands in the new arena is shown:

06.02.2016 - Andrei Peregudov in an interview with "Championship" spoke about the economic situation around the construction of the stadium "Dynamo".

23.12.2015 - The construction of the first tier of the stands has been completed and the workers are ready to start building the roof.

11.11.2015 - Eight megacolumns, unique in strength, have been assembled at the construction site.

23.10.2015 - Andrei Peregudov answered the questions of Gazeta.ru readers about the new Dynamo stadium, the film about Lev Yashin, the hockey arena in Petrovsky Park, as well as ticket prices.

14.10.2015 - The installation of metal columns has begun, which will serve as a support for the roof of the sports facility.

13.10.2015 - This is what the panorama of the future stadium looks like right now.

30.09.2015 - Andrey Peregudov in an interview with Kommersant spoke about the progress of the VTB Arena Park project and how the economic crisis affects the construction site.

16.09.2015 - The general sponsor of FC Dynamo, VTB Bank, invited the head coach Andrey Kobelev and the football players Alexander Kokorin, Roman Zobnin and Alexander Tashaev to the VTB-Arena construction site in Petrovsky Park. Dynamo took part in the construction of the stadium, and were also the first to play with a soccer ball in the center of the field.

11.09.2015 - In the center of the future football field, a 30-meter image of the letter "D" was painted, which will forever remain at the Dynamo stadium. Andrei Peregudov said that Dynamo will most likely start playing at the new stadium from the second round of the 2017/18 season.

19.08.2015 - Delegates from the European Stadium & Safety Management Association (ESSMA) visited the VTB Arena - Dynamo Central Stadium named after Lev Yashin as part of the ESSMA Construction Workshop symposium held in Moscow 18 -August 19.

30.07.2015 - Work is underway to install reinforced concrete beams designed to support the future stands of the stadium. The beams are installed along the entire perimeter with the same pitch, after their installation, the process of assembling the stands will begin.

16.06.2015 - A meeting of the working group was held at the headquarters of VTB Arena Park, during which they spoke about the plans and work on the construction of the Dynamo stadium.

26.05.2015 - At the construction site of the Dynamo stadium, the erection of the stands begins. One of the construction directors of the sports section of VTB Arena Park, Carlo Melella: “Construction is proceeding very quickly. people. Construction is going on around the clock in three shifts of eight hours. "

06.03.2015 - The action "Let's build a stadium together" took place. Several dozen Dynamo fans, who responded to the invitation to participate, worked for a couple of hours at the construction site of their native stadium. They contributed to the erection of the wall of the future Dynamo Museum by laying several levels of bricks. Everyone was able to sign them. All work was carried out under the supervision of professional builders - they were kneading concrete, dragging bricks, laying the masonry.

06.03.2015 - A little more about the construction process at the level of the football field: now the builders are laying the ducts inside the reinforcement cage. Later, concrete will be poured into the enclosure, which is located around the entire system. After the concrete setting process, the ropes will be tightened, which will help to create a strong stability of the base. Further, the ropes will need to be covered with a special solution, which prevents the rope from weakening due to friction, and also protects against corrosion.

16.01.2015 - zero cycle work continues

14.01.2015 - Mosgorexpertiza gave a positive opinion on the final stage of the project for the complex reconstruction of the territory of the Central Dynamo Stadium. Thus, the entire arena project was approved.

25.12.2014 - Gazeta.ru held an online conference with Andrey Peregudov, who said that heating at the stadium will be in all stands, and the zero cycle of work is almost complete.

23.10.2014 - Senior Vice President of VTB, head of the VTB Arena Park project Andrei Peregudov spoke in an interview with Kommersant about the construction of the Dynamo stadium.

09.10.2014 - The schedule for the construction of the stadium is available on the VTB Arena Park website.

08.10.2014 - Photos of the new model of the Dynamo stadium project are presented.

25.09.2014 - A video about the construction of the stadium with comments from VTB Arena Park representatives on the Moskva 24 channel.

01.09.2014 - Installation of zero-level structures has begun.

02.07.2014 - The management of VTB Arena Park signed a contract for the construction of the stadium with Codest International S.r.L., which is the contractor for the construction of the commercial part of the project.

15.05.2014 - The management of the VTB Arena Park project terminated the contract with the French company VINCI Construction Grands Projets, which acted as the general contractor for the construction part.

07.05.2014 - The concrete is being poured.

19.04.2014 - Preparatory work on pouring the foundation slab began, the first sections of concrete appeared

01.04.2014 - Fans held a picket against the inaction of the builders of the Dynamo stadium

13.03.2014 - Moscow authorities gave permission for the construction of the stadium

PROJECT

VTB Arena Park is a comprehensive reconstruction project and adaptation for modern use of the Central Dynamo Stadium and the adjacent territory. It includes the stadium itself, the city block, the sports park and the Dynamo sports academy.
Capacity Central stadium "Dynamo" will be 26 319 seats.
VTB Arena, small sports arena, has 3 configurations: hockey - 11,488 seats, basketball - 12,770 seats, concert - 14,000 seats, while changing from one configuration to another is carried out in a matter of hours.
Leisure and entertainment complex area - 30 thousand m2
Also under the sports and entertainment complex is provided parking for 733 cars.
Opening VTB Arena - Dynamo Central Stadium is scheduled for the birthday of the best goalkeeper in the world according to FIFA, Lev Yashin, October 22, 2017.

The Dynamo Stadium is the cradle of not only domestic football and Russian hockey, but also ice hockey - it was here that one of the first grounds for playing Canadian hockey was arranged and the matches of the first USSR championship-1946 were held, in which Dynamo won the victory under the leadership of the player trainer Arkady Chernyshev. It is curious that one of the German prisoners of war told Chernyshev the rules of the Canadian hockey game, who himself went to the ice rink before the war, and after the war worked on the territory of the Dynamo stadium along with dozens of other prisoners of war.

In the first months of the war, the stadium became a real military facility, turning into a base for the formation and training of OMSBON units - a separate motorized rifle brigade for special purposes - operating behind enemy lines.

In 1955, the historic USSR-Germany match was played at Dynamo, in which Soviet football players beat the reigning world champions - 3: 2.

Several matches of the 1957 World Ice Hockey Championship were played at Dynamo - this was the last time in the history of world championships when matches were played on natural ice.

"VTB Arena - Dynamo Central Stadium named after Lev Yashin"

The complex unites two arenas under one roof: the Central stadium "Dynamo" named after Lev Yashin (football) and VTB Arena them. A.I. Chernysheva (hockey). The total area of ​​the complex is about 210 thousand square meters. m.

Today the Central stadium "Dynamo" them. Lev Yashin is an open-air football stadium, the seats of which are protected by a canopy. The arena has a capacity of 26,121 people during a football match, and 33,000 people during a concert.

VTB Arena them. AI Chernysheva is a covered multifunctional area, which is designed for hockey and basketball matches, business and concert and entertainment events of any level of complexity. The small arena has a capacity of up to 14,000 spectators, depending on the configuration of the venue during the event. Changing the space of the site takes only a few hours. VTB Arena includes 44 VIP boxes for 6-11 people and 1 VVIP box for 60 people.

The complex has an underground parking for 719 cars, including 23 cars for people with limited mobility. On the 6th floor of the complex, there is a premium view restaurant with 380 seats, which allows you to watch events in both arenas. The Arena Plaza shopping center is located on the ground floor of the building.

You can read about the work of the media at the stadium.

Driving directions and passage

Arena Activity Scheme

Share this